Pharmaceutical Hoist & Lift Control System Upgrades

Pharmaceutical lifting equipment · Control system upgrades

Your hoists still lift.
Their controls are running out of road.

We replace obsolete PLCs, safety relays, drives and HMIs on pharmaceutical platform lifts, post lifts, slew hoists and IBC, drum and bin hoists. You keep the validated mechanics and get a modern safety PLC system, fully documented, CE/UKCA or UL compliant, and rated for your hazardous area if you have one.

CE · UKCA UL 508A · NFPA 79 ATEX · IECEx Class I/II Div 1 & 2 ISO 13849 · SISTEMA
OBSOLETE SAFETY PLC
Oct 2025Siemens S7-300 / ET 200M entered product cancellation. Spares only, until 2033
Nov 2026Siemens S7-1200 (G1) phase-out announced. New units only until Oct 2027
PLC-5 · SLC 500Allen-Bradley platforms discontinued, with migration to Logix advised
0changes to your validated mechanical structure in a typical control retrofit
The problem

Pharma lifting equipment outlives its control system

Stainless platform lifts, column hoists and IBC handling systems are built to last 25 years or more. The PLCs, safety relays, drives and operator panels inside them aren’t. Across UK, European and US pharmaceutical sites, a large share of lifting equipment is still running on controllers that the manufacturers have stopped making.

Spares you can’t get

When a CPU, I/O card or safety relay fails, you end up on the grey market for refurbished parts with unknown history, long lead times and premium prices. Each failure is a production stop that nobody planned for.

Safety that predates today’s standards

Many older hoists were designed to EN 954-1 categories, or with hard-wired relay logic and no documented Performance Level. Current ISO 13849-1 verification, platform-lift risk assessments and insurer inspections increasingly expose those gaps.

Knowledge that walked out the door

The original programs may be locked, undocumented or lost. The OEM may have stopped trading or no longer supports the model, and the engineer who knew the system has retired. Old software and programming cables may only run on an ageing laptop.

Hazardous-area exposure

Solvent rooms, spray dryers and powder handling areas need certified Ex equipment. Old field devices, glands and junction boxes often can’t be traced back to their certification, and that’s a risk your DSEAR or NEC compliance can’t carry.

Batch and schedule risk

A hoist that docks an IBC onto a blender or feeds a granulator is on the critical path. If it stops mid-campaign, you can lose a batch, a shift and a delivery slot all at once.

Replacing the whole machine is overkill

A new hoist means capital approval, a new URS, re-validation, cleanroom disruption and long fabrication lead times. If the steelwork, guides and lifting mechanism are sound, you probably don’t need one.

Common obsolete platforms we replace

Platform found on older hoists & liftsStatusTypical upgrade path
Siemens SIMATIC S5DiscontinuedS7-1500F / ET 200SP F-CPU safety PLC
Siemens S7-200DiscontinuedS7-1200F / ET 200SP F-CPU
Siemens S7-300 / ET 200MCancelled Oct 2025 · spares onlyET 200SP F-CPU or S7-1500F, with code migrated and restructured
Siemens S7-1200 (first generation, G1)Phase-out from 1 Nov 2026 · new until Oct 2027S7-1200 G2, or ET 200SP F-CPU where safety is integrated
Siemens SIMATIC Comfort Panels & older HMIsPhasing outUnified Comfort / Basic panels, or a cleanroom-suitable stainless HMI
Allen-Bradley PLC-5DiscontinuedGuardLogix / Compact GuardLogix, or Siemens safety platform
Allen-Bradley SLC 500 & MicroLogixMany catalogue numbers discontinuedCompact GuardLogix 5380 or Siemens ET 200SP F-CPU
Allen-Bradley CompactLogix 1768-L4xDiscontinuedCompact GuardLogix 5380
Hard-wired relay logic & legacy safety relaysNo documented PLSafety PLC with SISTEMA-verified safety functions
Legacy text displays & early HMIsPhasing outModern touch HMI with diagnostics, alarms and user levels
Older VFDs & DC drivesVariesCurrent drives with STO safe torque off, integrated into the safety system

Lifecycle status is shown in general terms and changes over time. We check the exact status of your installed part numbers as part of the audit. Brand names belong to their owners.

Not obsolete yet, but on the clock

S7-1200 (G1): the controller in its twilight years

Thousands of newer hoists and platform lifts, including many built in the last ten years, run on the first-generation Siemens S7-1200. Siemens announced its phase-out on 1 November 2026. New units can be ordered until 31 October 2027, then it’s spare parts only, with spares stated to run to 2036. The successor is the S7-1200 G2.

That isn’t a reason to rip out working systems tomorrow. It is a reason to plan, because on a pharma site the hard part isn’t the hardware. It’s the change control, the shutdown slot and the documentation. Machines in the twilight phase are the cheapest and calmest to upgrade: the parts are still available, the original engineers can still be reached, and you choose the date, not a failure.

  • Installed-base survey: which hoists use S7-1200 G1, Comfort Panels or other parts in phase-out
  • Last-time-buy list of critical spares to cover you until the upgrade
  • Migration to S7-1200 G2 or ET 200SP F-CPU, scheduled into a planned shutdown
  • Combine it with a safety review and the encoder and remote I/O upgrades below, so you pay for one change control, not three

Siemens lifecycle in plain English

StageWhat it means for you
ActiveBuy freely. Design new machines on it.
Phase-out announcedStill available new, but the clock has started. Plan the upgrade now.
CancelledSpares only. Prices rise and lead times stretch. Upgrade at the next shutdown.
DiscontinuedGrey market only. Every failure is a production stop.

S7-1200 G1 entered the second stage on 1 Nov 2026. S7-300 is in the third.

The upgrade

Keep the mechanics. Renew the controls.

We design, build, install and commission a complete replacement control system around your existing lifting equipment. Your steelwork, guides, drive train and product-contact parts stay as they are. Everything electrical that’s obsolete, unsafe or unsupported gets replaced and documented to current standards.

Safety PLC control

Our standard platform is the Siemens ET 200SP F-CPU safety PLC, with safety and standard logic in one controller. We supply Rockwell GuardLogix where site standards require it.

Verified safety functions

We re-assess the risks, define each safety function and verify the achieved Performance Level in SISTEMA to ISO 13849-1/-2. That covers e-stops, interlocked gates, over-travel, slack-rope and chain monitoring, load and position, and dead-man control.

Drives & motion

New VFDs with integrated Safe Torque Off, controlled acceleration for smooth docking, slow-speed creep zones and absolute position feedback, so loads arrive gently and repeatably.

Operator HMIs & pendants

Cleanroom-suitable stainless operator stations, pendants and touch HMIs, with clear status, alarm history and maintenance diagnostics. Engineers can see exactly which interlock stopped the lift.

Control panels built in-house

We build panels in our own workshop to IEC 60204-1 and, for North America, UL 508A with NFPA 79 practice, and apply UL labels to panels for US machines.

Documentation that stands up

Full EPLAN electrical schematics, I/O lists, cable schedules, safety function specification, SISTEMA report, FAT/SAT protocols, O&M manual and as-built drawings. It’s written to support your change control and qualification.

Equipment we upgrade

  • Platform lifts and personnel/material access platforms
  • Post lifts and column lifts (single and twin post)
  • Slew hoists and slewing column hoists
  • IBC, drum, bin and container hoists
  • Docking, tipping, inverting and blending hoists
  • Material lifts between floors and process levels
  • Monorail and overhead hoist systems
  • Associated conveyors, turntables and transfer equipment

What you get

  • Obsolete PLC, safety relays, drives and HMI fully replaced
  • Existing logic reverse-engineered, improved and documented
  • Safety functions re-verified to ISO 13849 with a SISTEMA report
  • Optional absolute encoders, position-based speed profiles and software limits
  • Optional remote safety I/O for new LOPs and safety devices
  • Panels pre-built and tested before they reach site (FAT)
  • Installation planned around your shutdown window
  • SAT, operator training and handover pack
  • Unlocked, commented code and a spares list you can actually buy
  • Optional remote support and lifecycle service
More than a like-for-like swap

Absolute encoders and remote I/O: a smarter hoist, not just a newer one

An upgrade is the right moment to fix the things operators and maintenance teams have put up with for years. Two changes make the biggest difference on pharma lifting equipment: absolute position feedback, and distributed safety I/O on PROFINET/PROFIsafe.

Absolute encoders

Accurate, repeatable positioning

The PLC knows exactly where the carriage, platform or slew arm is at all times. It doesn’t have to infer position from a count of limit switches. Docking onto a blender, a mill or an IBC valve becomes accurate and repeatable, every cycle and every operator.

Power-loss recovery with no homing

An absolute encoder remembers its position through a power cut, an e-stop or a shutdown. The hoist doesn’t need to drive to a home switch with a load hanging or a container docked. It resumes from where it is, which is safer for the product and quicker to recover.

Defined flight paths

Speed and acceleration profiles are tied to position: fast travel in open space, then creep into the docking zone and slow past obstructions. Slew-and-lift moves follow programmed paths around columns, vessels and platforms. Moves are smoother, quieter and kinder to the load.

Goodbye to clunky limit switches

Banks of cam and position switches, with their brackets, cabling and adjustment, are replaced by software positions you set from the HMI. There’s less to clean in a cleanroom, less to fail and less to readjust. Safety-related limits stay safety-rated: we keep an independent ultimate overtravel limit, or use a safety-rated encoder for safe position monitoring, and verify the design in SISTEMA.

Data for maintenance

Position and speed data let the HMI log cycle counts, travel distance and run time against each axis. Planned maintenance can then follow real usage, not the calendar.

Remote I/O & PROFIsafe

Add LOPs without rewiring the machine

Local operator panels connect over a single network cable to distributed I/O. Need a new LOP on a mezzanine, a second docking station, or a pendant on the other side of a vessel? It’s a network drop and a software change, not a new multicore back to the main panel.

New safety devices, easily integrated

Light curtains, interlocked gates, safety mats, enabling switches and e-stops plug into fail-safe I/O modules near the machine and talk to the safety PLC over PROFIsafe. They’re added to the SISTEMA model and validated, without major panel modifications.

Less cabling, cleaner installs

Far fewer cores run through drag chains, containment and cleanroom penetrations. Clean IP65/IP67 stainless enclosures sit where the devices are, and there are fewer terminations to go wrong.

Hazardous areas too

In Ex zones we use certified remote I/O and Ex junction boxes, including intrinsically safe I/O for Zone 1 / Zone 21 where appropriate, so new devices in the zone still don’t mean new multicores to the safe area.

Faster fault-finding

Every device has a named channel with diagnostics on the HMI, so maintenance can see exactly which interlock or sensor is stopping the lift, and where it is.

Compliance, wherever your plant is

CE · UL · ATEX · Class/Division

Pharma companies run sites on both sides of the Atlantic, and their lifting equipment has to comply wherever it’s installed. We design to the regime your site, your insurer and your engineering contractor expect, and we know how the European and North American approaches differ.

Europe & UK

CE & UKCA

Control systems are designed to meet the essential health and safety requirements of the Machinery Directive 2006/42/EC, and with an eye on the new EU Machinery Regulation (EU) 2023/1230, which applies from January 2027. For the UK we design to the Supply of Machinery (Safety) Regulations 2008.

  • Electrical design to EN 60204-1 / EN 60204-32 (hoisting machines)
  • Functional safety to EN ISO 13849-1/-2, verified in SISTEMA
  • Risk assessment to EN ISO 12100
  • Technical file content and DoC/DoI support for modified machinery
  • EMC and Low Voltage requirements addressed in panel design
North America

UL 508A & NFPA 79

For US sites we supply industrial control panels built and labelled to UL 508A, with machine wiring practice to NFPA 79 and installation compatible with the NEC. We’ve worked to tier-1 engineering contractor specifications for US pharmaceutical projects.

  • UL-labelled industrial control panels
  • Short-circuit current rating (SCCR) calculated and marked
  • UL-recognised/listed components throughout
  • NFPA 79 wire colours, sizing and protection
  • Siemens or Rockwell platforms to suit site standards
Hazardous areas · Europe

ATEX & IECEx

We’re used to lifts that sit inside classified areas such as spray dryers, solvent handling and fine powders. We specify certified field equipment and an architecture that keeps as much as possible in the safe area.

  • Equipment selected for Zone 1/2 (gas) and Zone 21/22 (dust)
  • Equipment category and gas/dust group & T-class matched to the area classification
  • Main control panel in the safe area, with Ex junction boxes and Ex operator stations in zone
  • Intrinsically safe (Ex i) circuits and barriers where appropriate
  • Ex e / Ex d terminations, certified glands and field cable selection
  • Documentation to support DSEAR and EN 60079-14 inspection
Hazardous locations · North America

Class / Division & Zone

US and Canadian sites classify hazardous locations under NEC Article 500 (Class/Division) or Article 505/506 (Zone). We design control systems and select field devices to match your site’s classification.

  • Class I (gases/vapours) Division 1 & 2
  • Class II (combustible dusts) Division 1 & 2
  • Division-rated or purged/pressurised enclosures where needed
  • Intrinsically safe and non-incendive field wiring
  • Seal fittings, conduit and cable practice coordinated with the installing contractor

GMP-aware by default

We work within your change control. Our documentation follows a GAMP 5 risk-based approach, our FAT/SAT protocols can feed your IQ/OQ, and we design HMIs for cleanroom use and cleaning regimes. If your site needs user management or electronic records, we can scope a 21 CFR Part 11-capable HMI.

How a retrofit runs

From audit to handover, with as little downtime as possible

Most of the work happens in our workshop, not your cleanroom. Panels are built and tested before we arrive, so the on-site changeover fits a planned shutdown.

Obsolescence audit

On-site survey of the hoist, panel, field devices and software. We record installed part numbers and lifecycle status, recover existing programs and drawings, and photograph everything.

Risk & safety concept

Risk assessment review, safety function list and target Performance Levels. Hazardous-area classification is confirmed with your EHS team or engineering contractor.

Proposal & fixed scope

A clear scope of supply with fixed deliverables, a single drawing issue and a consolidated change list. You know exactly what you’re buying.

EPLAN design

Full electrical design in EPLAN, I/O and cable schedules, Ex equipment selection and SISTEMA calculation, issued for your approval.

Build & software

Panels built in-house. Logic is reverse-engineered, restructured and written to our proven hoist control standard, with full commenting.

Factory acceptance test

Panel and software tested against a simulated machine before shipping. You’re welcome to witness it, in person or remotely.

Install in your shutdown

Old system removed, new panel and field devices installed, terminations made. The cutover is planned hour by hour.

SAT, validation support & training

Site acceptance test, safety function validation, operator and maintenance training, as-built documents and the handover pack.

Why Automate and Control

Specialists in pharmaceutical lifting controls

Pharmaceutical hoists and platform lifts are most of what we do. For years we’ve designed and supplied control systems for new lifting equipment that OEMs ship to global pharmaceutical manufacturers and tier-1 engineering contractors in the UK, Ireland, Europe and the United States.

We know what end users, EPCs and validation teams expect, because we answer to their specifications every week. Upgrading existing equipment is a natural extension of that work. We bring the same safety PLC standard, the same documentation and the same rigour to machines that are already installed.

  • Proven hoist and platform-lift control standard on Siemens safety PLC
  • Certified UL panel builder, plus CE/UKCA panel design
  • Hazardous-area experience: Ex zones, Ex junction boxes, Ex operator panels
  • ISO 13849 functional safety and SISTEMA verification in-house
  • Machine vision and inspection capability for added value
  • Direct access to the engineers who design your system
SAFE AREA EX ZONE / CLASS-DIV Main control panel F-CPU safety PLC VFD + STO IS barriers Ex junction box Ex e / Ex i Ex operator station E-stop · dead-man Hoist field devices
FAQ

Questions engineering and validation teams ask us

Do we have to replace the whole hoist?

Usually not. If the structure, guides, lifting mechanism and product-contact parts are in good condition, a control retrofit brings the machine up to date for a fraction of the cost and disruption of a new one. During the audit we’ll tell you honestly if mechanical work is also needed.

Will a control upgrade affect our validated status?

Any change goes through your change control, but a like-for-like functional retrofit is normally a much smaller qualification exercise than a new machine. We provide a functional specification, traceable FAT/SAT protocols and as-built documents to support your impact assessment and any IQ/OQ re-execution.

Is an upgraded machine a “new machine” under CE / UKCA rules?

That depends on how significant the modification is. Where an upgrade changes the safety functions or introduces new hazards, the modified machine may need a fresh conformity assessment. We assess this with you and provide the risk assessment, safety verification and technical file content so the right declaration can be made.

How long will the hoist be out of service?

Because panels are built and tested off-site, on-site changeover is typically planned into a scheduled shutdown and measured in days, not weeks. We agree a detailed cutover plan with you in advance.

Our original program is locked or lost. Can you still help?

Yes. We regularly work from the machine itself: observing its sequences, tracing wiring and interviewing operators to rebuild a full functional description. The new software is written from that description, and you receive it fully documented.

Our hoists run on S7-1200. Do we need to upgrade now?

Not immediately. Siemens’ first-generation S7-1200 entered phase-out on 1 November 2026, with new units available until 31 October 2027 and spares after that. Now is the time to survey your installed base, secure critical spares and plan the migration into a scheduled shutdown, rather than waiting for a failure.

If the power fails mid-lift, does the hoist have to re-home?

Not with absolute encoders. The position is retained through power loss and e-stops, so the hoist resumes from where it stopped without driving to a home switch with a load attached or a container docked.

Can absolute encoders really replace our limit switches?

They replace the operational position and slow-down switches, which is most of them. Safety-related limits such as ultimate overtravel stay safety-rated. We either keep an independent safety limit or use a safety-rated encoder with safe position monitoring in the safety PLC, depending on the risk assessment and the Performance Level required.

Can we add more operator panels or safety devices later?

Yes. That’s the point of remote I/O. New LOPs, pendants, light curtains and interlocks connect over PROFINET/PROFIsafe to distributed I/O near the machine, so extensions are a network drop and a software change, not a rewire.

We’re a Rockwell site. Do you only use Siemens?

Our standard is the Siemens ET 200SP F-CPU safety PLC because it gives the best result on hoist applications. Where site standards call for Allen-Bradley GuardLogix or Compact GuardLogix, we can design to that instead.

Can you work in ATEX zones and Class/Division locations?

Yes. We design the control architecture around your area classification, select certified Ex field equipment, and keep the main panel in the safe area where possible. For North American sites we work to NEC Class/Division or Zone classification, with Division-rated equipment and intrinsically safe circuits where appropriate.

Will we get the source code?

On upgrade projects you receive commented, documented software for your machine, so your maintenance team or future integrators aren’t locked out. Licensing terms for our underlying hoist control library are agreed up front.

Do you work through OEMs and engineering contractors as well as end users?

Yes. We work directly for pharmaceutical end users, as a subcontractor to lifting equipment OEMs, and within EPC-managed projects. We’re used to working to EPC electrical and instrumentation specifications.

Where do you work?

We’re based in the UK and support projects across the UK, Ireland, mainland Europe and the United States.

Free obsolescence audit

Find out how much life your hoist controls have left

Tell us what you’re running. We’ll come back with the lifecycle status of your installed control hardware, the main safety and compliance gaps, and a budget range for an upgrade, with no obligation.

  • Lifecycle report on installed PLC, safety, drive and HMI hardware
  • Headline safety and hazardous-area gap review
  • Budget estimate and suggested shutdown plan

Tell us about your hoist

Send us the equipment type, the site’s hazardous-area classification (if any) and a photo of the control panel and PLC rating plate. That’s all we need to start.

Request my audit Functional safety & PL services